16/10/99
17/10/99
18/10/99
19/10/99
20/10/99
21/10/99
22/10/99
23/10/99
24/10/99
25/10/99
26/10/99
27/10/99
28/10/99
29/10/99
30/10/99
31/10/99
01/11/99
02/11/99
03/11/99
20/11/99
21/11/99
22/11/99
23/11/99
24/11/99
25/11/99
26/11/99
27/11/99
28/11/99
29/11/99
30/11/99
01/12/99
02/12/99
03/12/99
04/12/99
05/12/99 |
What
happened today:
09:00 Breakfast
at the hotel. Right after we start to drive downtown and pick up
our material, which had been stored in safe places. Driving
downtown and back always takes almost one hour. Most of the
aluminium had been stored in our trailer at the hotel and in the
container on the hill. There is one team starting to put up the
Inverted L for 160m (Titanex made). Other jobs are to run the
electric power cable and the telephone line again.

Left: DL8WPX, DK1BT, DL3DXX, and the 160m Inverted L; Right:
"Who the f*ck rolled up this cable last time???"
· Later we start to put the
stations for 10m, 15m and 20m together. Everything so far is
just a reproduction of the SSB setup. We can get all three bands
working this day. There are some first, short activities as 5C8M,
just to test the setups:

Left: DL2MEH playing on the 15m position; Right: Sunset
behind the 10m antennas (two Cushcraft
XM510, two Cushcraft 10-4CD).
|